Work train
Fred Prinsen BV is very experienced in loading and unloading the work train. To make sure the work proceeds fluently we use all of our trucks to unload the carriage with old sleepers and transport them to our yard in Austerlitz. After the train has been unloaded we immediately start with loading the new concrete sleepers. It’s important for the contractor to get the loaded carriages back to the work train as soon as possible. As we have several cranes available this can be done very quickly.