Breaking up the track
Fred Prinsen BV is very good at breaking up tracks.ie Schienen können in Abschnitten entnommen werden, oder bei Platzmangel können wir die Schienen auseinanderbauen und die Gleise und Schwellen in den Bauhof bringen.
We have very experienced personnel who can burn the rails if they are not reusable anymore, or grind them to possibly reuse the rails.
The tracks can be removed in sections or if there is no space for that we can dismantle the tracks with our machines and then move the rails and sleepers to the construction depot. We use our railway cranes for this, with the required accessories. If there is no construction depot it’s also possible to remove the materials directly with our trucks.